Murray Zircon Primary Trommel Supply

IHC Robbins were approached by Murray Zircon to supply a new Primary Trommel Unit to replace the existing machine located at their Mindarie operation as the existing unit was not delivering expected throughputs and bottlenecking the operation.

A challenging part of the supply project was to ensure that the new unit would be easily retrofitted within the existing trommel envelope and still meet the performance criteria. The unit operates at 600 TPH and is fitted with 24 x 32 mm urethane screens.

The new trommel left Brisbane in December 2013 and was fitted and commissioned early 2014.

The machine is performing very well and throughputs were achieved and exceeded.

 

 

Location:              Mindarie | South Australia

Client:                   Murray Zircon

Services:              Design, Supply, Delivery