Supply of FPSO Equipment to Yinson

Malaysian FPSO provider Yinson awarded Royal IHC a contract for the supply of a tandem mooring & offloading system and a riser pull-in system. The equipment will be placed onto the Anna Nery floating production, storage and offloading (FPSO) vessel on behalf of Yinson.

The FPSO vessel will be installed around 150 kilometres off the Brazilian coast, in a water depth of 930 meters. The Anna Nery FPSO will be able to produce 70,000 barrels of oil and 4 million cubic metres of gas per day. The production start-up is scheduled for the years 2022 and 2023, The units will be operated and chartered for 25 years.

The innovative design of our offloading and riser pull-in system minimises the space needed on board for storage. We have a proven track record in the delivery of over 20 turnkey systems of this type worldwide. 

 

This contract provides further evidence that Royal IHC is firmly established as a reputable partner for the design and development of advanced equipment for the floating production market. We look forward to building what we hope will be a long-term partnership with Yinson by working collaboratively on this important project.

Andre Merlino - Former Executive Director Offshore Royal IHC
abstract deck spread

Get in touch

Our experts will be pleased to discuss your requirements and your optimal solution with you.