Our global projects

550mT Riser Pull-in system 

One large riser pull-in system for the Pre-salt oil fields, complete with 150mT aux. winch and sheave trolley

FPSO and FPU equipment

Al Bahar

The self-propelled CSD 'AL BAHAR' C/D HUTA 12 owned by Huta Marine Works was specially designed to dredge hard soil in difficult climatic conditions on both sides of the Arabian Peninsula.

read more

DREDGERS FOR HARSH ENVIRONMENTS

Reliable dredging equipment was needed to help widen and deepen the Madeira River. Royal IHC sent two standard IHC Beaver® cutter suction dredgers, the JATUARANA I and II, to Brazil.

View Case

pipelaying vessels for sapura

Integrating all critical equipment in the concept design phase and applying small but clever innovations results in efficient, safe and maintenance-friendly pipelaying vessels.

View Case

Active heave compensated hoisting system

The 400t active heave compensated hoisting system allows the heavy-lift vessel to perform more installation jobs each year, maximising return on asset investment.

View Case

CLOSE DREDGING PARTNERSHIP IN INDIA

Supporting successful port operator Adani Group with equipment and services to build and maintain numerous ports in India.

View case

Headquarters

From our head office in The Netherlands and with employees working from sites and offices on a global basis, we are able to ensure a local presence and support on every continent.

All locations

HYDROHAMMER S-2000

IHC IQIP has enabled Swancor to install two monopiles, using the Hydrohammer S-2000, as the foundations for the first offshore wind turbines in Taiwan.

Read more

Ilembe

TNPA required a highly reliable dredger, resulting in low-maintenance requirements, an excellent dredging performance, high workability and high levels of safety.

More about ILEMBE

PILING AND HANDLING EQUIPMENT

IHC IQIP has delivered state-of-the-art equipment for the installation of 67 monopiles at the Dudgeon Offshore Wind Farm.

NEW 1,400T UPENDING TOOL TO SHL

Rambiz

Scaldis has ordered a new crane ship, the Rambiz 4000, from Royal IHC. The vessel will be built in Qidong and finished in Xiamen, China.a

Heavy lift vessel

S-Lay system

1 x 175t tensioners & 1 x 350t A&R winch system for BP’s Israfil Hyseynov vessel

S-Lay systems

Sea Stallion 3 Plough for burial of telecoms cables

Mark 2 version of the SS3 plough complete with integrated control system

Subsea Cable Ploughs

Tandem mooring system TEN Project FPSO

Complete tandem mooring system, with 250mT mooring hook, hawser reel and Hydraulic power unit.

FPSO and FPU equipment

IHC Figures

Worldwide 0 employees
Group Equity 0 million euros
R&D investments 0 million
Total of 0 vessels built