Integrated power cablelay spread for Inter-Array cablelay

Global Marine Group awarded Royal IHC a contract for the design and delivery of an integrated power cablelay spread. The spread was installed on the vessel NORMAND CLIPPER.

Optimised for inter-array cablelay
The spread is optimised for inter-array cablelay and includes a patented quadrant handling system for second-end deployment operations. The equipment also includes Royal IHC’s 15Te break-back tensioners and an overarching control system. This integrates the control of the carousel, tensioners and quadrant handling system, which will enhance efficiency by reducing the required number of operators.

Fast mobilisation and demobilisation
Furthermore, the modular design of the spread enables rapid mobilisation and demobilisation. This allows for greater versatility with regard to the type of operations the vessel can perform, ensuring flexibility for future operations.

Delivery within accelerated delivery time
Together with KCI, its independent engineering subsidiary, Royal IHC has provided the equipment within an accelerated delivery period. The tensioners were provided on a long-term charter agreement from Royal IHC’s base in Newcastle.

We are proud to have been awarded this contract by Global Marine Group, which demonstrates IHC’s continued growth within the cablelay sector. We look forward to working with Global Marine Group to deliver this world-class spread of equipment.

Mark Gillespie - Executive Commercial Director – Offshore Royal IHC

We are very pleased to bring our new vessel, Normand Clipper, into service in the first quarter of 2020. This is a significant new asset for our Global Offshore business, allowing us to increase our capability and capacity to deliver well-engineered solutions for our customers. Royal IHC is the ideal partner to deliver the cable array deck spread, with their unique ability to supply new and existing equipment as a turnkey package in a short timescale. The fully integrated control system, with active heave compensation ensures that we will maximise our installation capability and protect our customers cables effectively.

Martyn Drye - Director of Engineering Director at Global Marine Group
Vessel at wind farm

More information

Feel free to reach out for more details